Posted On May 15, 2026

FlatironDragados advances $518M Virginia floodwater project

admin 0 comments
HHM Custom Homes LLC >> Uncategorized >> FlatironDragados advances $518M Virginia floodwater project

The start of construction follows a two-year preconstruction phase with the City of Virginia Beach under a progressive design-build contract. 

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

Amtrak keeps $1.6B East River Tunnel project on pace for 2027 finish

Though the overall program is still on track, crews pushed back the opening of one…

Los Angeles to open subway extension May 8

The nearly 4-mile extension is the first of three that will provide a through ride…

Duffy defends DOT grants pause, pledges not to hold up projects

Transportation Secretary Sean Duffy also spoke about the importance of permit reform in a recent hearing…